A deck is a floor built outdoors on its own frame, and the frame decides how long it lasts. This calculator counts what goes into a simple rectangular deck: rows of boards across the width, boards of the length you can buy, joists at the spacing your boards need and two screws per board at every joist. It also prices the deck in pine, balau and composite from published South African installed rates.
How the deck is counted
The boards run along the length. Each row covers the board's width plus the gap, so a 144 mm board with a 5 mm gap covers about 149 mm and a 4 metre wide deck needs 27 rows. Each row is made of bought lengths, and end joints should land on a joist and be staggered from row to row; the calculator adds 5 percent for offcuts. Joists run across the boards at the spacing you choose, one at each end, and every board is fixed with two screws at every joist.
Under the joists sit bearers and posts or piers, which depend on the height of the deck and the ground. They are not counted here; a deck builder sizes them from the height, the span and the soil.
Joist spacing and board choice
Softwood and hardwood deck boards around 22 to 32 mm thick are commonly laid on joists at about 400 to 450 mm. Composite boards are usually less stiff and many makers ask for joists at 300 to 400 mm, closer still for diagonal boards or stairs. Check the spacing on the product sheet before you count, because it changes the timber in the frame more than anything else.
Treated pine is the budget choice and needs oiling or sealing every year or two in the sun. Balau and other hardwoods cost about three times as much installed but last much longer. Composite costs the most and needs no oiling, but gets hot in direct sun, which matters round a pool. See wooden decking, composite decking and pool decking.
Before you ask for quotes
Note the height of the deck above the ground at its lowest and highest points, whether it is fixed to the house, what the ground is (soil, paving or a slab), and any steps, balustrades or a pool coping it must meet. Raised decks may need plans approved by the municipality; ask the builder. Send the measurements with your request, and ask each builder to quote the frame timber and its treatment class as well as the boards.